Uncategorised

New Wagon Project

London North Eastern Railway 1950 Brake Corridor Third E1866 (GOLD)As the weather has turned colder and outside tasks become more difficult, the Thompson coach, usefully located inside the shed, has been able to see a little more progress. The recently…

Removing the tram tracks

One of the trickier tasks I faced with transforming the setting of my inner-Melbourne HO Scale shelf layout to the NSW North Coast, was removing the tram tracks that once ran down the middle of the Philden Street overpass. They were anchored down to th…

Rhiw running session

 A decision was made to have regular running sessions for the current exhibition animals. This rather than the last minute check before a show. This week Rhiw came out of the box and some of the new stock was introduced, the short wheelbase pickin…

Parkside vac-braked minerals

The weekend saw a push to get a rake of vac-braked 16 tonners painted up. These representing what must have been the last use of these on scrap traffic. With four left to do it was a case of looking at Paul Bartlett’s excellent wagon photo site an…

Keeping within 1st Radius

For some modellers the sight of a 600 mm x 1200 mm x 7 mm sheet of plywood isn’t going to do much to excite the senses or go too far towards completing the benchwork in your walk around model railway plans. So when the sheet measured only 596 mm wide x…