Uncategorised

Great Gresley Progress

London North Eastern Railway 1950 Brake Corridor Third E1866 (GOLD)Existing tasks continue, including cleaning the brass window frames and improving the passenger door frames ready for their new skins.London North Eastern Railway 1938 Brake Third Open …

Uncategorised

Wednesday 13th – Decisions

 The main decision was to all agree the South Malvern side door pillar was in need of some TLC, Steve and Bob moved in and before long Steve had removed the lower Z section, and Bob had removed the heavily corroded floor bearer.Steve’s aim was to …