How a 2 week project has taken 2 monthsFast-Tracks turnouts are promoted as being quick to make, using their assembly jigs, PCB strips, and filing tools. Don’t believe the sales broucher.Providing Train orders to the engineer. I captu…
My experience with Fast Tracks.A “down” QUBE steel train approaches Shepherds on Jan 30, 2025 at around 80-90Kph. This snapshot through the car windscreen. Of note is the lack of wires on the lineside poles – these copper wires have b…