Shattered

Getting a few corner points in on Drovers Brook. The one to sort now is the bridge. As always this is travelling hopefully and I was to find this out quickly. There were a couple of pillars in the box; these may have been built by Mr. Hill. Anyway, as …

Skip

The last piece (for the minute) for Rhiw is a skip; one of those that sits by the lineside with a mix of gash inside and seemingly has no means of being retrieved.The root is one of a pair from the Peco Modelscene range which is stamped Leafdale Models…

Seething station

 Only a few details and some scenic patching to do now, all well ahead of the deadline of Beccles on June 1st. Most of this scene is either s/h junk or other peoples chuck-outs. I bought a bag full of tatty trees off a club stand and refurbed a co…

Occupation bridge weight loss

 The B layout. With the A layout reaching an approximation of completeness it was time to start getting a few corners in place on the RM epic. Lumpy narrow gauge layouts need a lot more planning as there are more verticals to play with. This isn’t…

Seething Bridge

And so it came to pass that the bridge was built. This, like everything else on this project, was to be as close to zero cost as possible. Any bit of scrap and offcut was inspected to assess usefulness and a selection of (unmatching) brick sheet was se…