The rail line between Reading and Gatwick Airport will close for nine days from this Saturday, as Network Rail upgrades signalling.
Category: Half Term
- Bitterne
- Bursledon
- Cosham
- Eastleigh
- Essex
- Fareham
- Fratton
- Govia Thameslink Railway
- Great Western Railway
- Half Term
- Hamble
- Hampshire
- Havant
- Hedge End
- Hilsea
- Infrastructure
- London
- London Waterloo
- Netley
- Network Rail
- Portchester
- Portsmouth
- Portsmouth Harbour
- Sholing
- South Western Railway
- Southampton
- Southampton Central
- Southern
- St Denys
- Swanwick
- Thameslink
- Woolston
Half Term Disruption for Hampshire Rail Passengers
Passengers travelling between Eastleigh and Fareham face another week of disruption next week, following last week’s suspension for stabilisation work.
Steam locomotive 4277 to visit the North Norfolk Railway
The North Norfolk Railway has revealed its programme for school half term, including the visit of 104 year-old steam locomotive GWR tank engine 4277.
Wokingham to see diversions for motorists starting today (26th Jan) as Network Rail carries out reliability upgrades
Level crossings at Wokingham station and Easthampstead Road (Star Lane) will be temporarily closed whilst the upgrade work takes place