Brightline West Selects Atlas Technical Consultants for Geotechnical Engineering

AUSTIN, Texas – For the high-speed rail project scheduled to open in 2028, Brightline West chose Atlas Technical Consultants to handle the engineering and design.
The post Brightline West Selects Atlas Technical Consultants for Geotechnical Engineering…

South Coast Rail Construction Almost Complete

TAUNTON, Mass. – Construction on the South Coast Rail project between Boston and Southeastern Massachusetts is nearing completion. Once that occurs, safety testing can begin.
The post South Coast Rail Construction Almost Complete appeared first on Rail…

WATCH: SMART Gauntlet Track Construction for Petaluma North Station

PETALUMA, Calif. – From April 13th to 14th, SMART will have a partial system closure to install a gauntlet track for a new Petaluma North station.
The post WATCH: SMART Gauntlet Track Construction for Petaluma North Station appeared first on Railway T…

Saskatchewan Short Lines Receive C$530K in SRIP Allocations 

SASKATCHEWAN – The government of Saskatchewan announced it is investing C$530,000 in short line rail infrastructure.
The post Saskatchewan Short Lines Receive C$530K in SRIP Allocations  appeared first on Railway Track and Structures.

Track Inspections and Speed Restrictions After 4.8 Earthquake in NJ; Amtrak, CSX

WHITEHOUSE STATION, N.J. – After a 4.8 earthquake, Amtrak implements speed restrictions and performs track inspections. CSX inspected bridges and related structures.
The post Track Inspections and Speed Restrictions After 4.8 Earthquake in NJ; Amtrak, …

Metra Outlines 2024 Construction Plan

CHICAGO – Metra on April 3 detailed its construction program for 2024, covering station, track, road crossing, bridge, and signal/communications improvement projects along the Chicagoland commuter railroad’s 11 lines totaling nearly 500 route-miles. In…

Smart Rocks, Smart Tamper: Investigating the Mechanics of Ballast Tamping

ATLANTA – Railway Track & Structures, April 2024 Issue: There are many forces that work to deteriorate track geometry over time. These forces don’t begin and end at the wheel/rail interface; they are transmitted to the vehicles and their component…

2021 CP Derailment Caused by Undetected Rail Flaw

Winnipeg, MANITOBA – The TSB in Canada reported an undetected rail flaw led to a broken rail and subsequent derailment of a CP train back in October 2021.
The post 2021 CP Derailment Caused by Undetected Rail Flaw appeared first on Railway Track and St…

Boosting Rail Safety and Efficiency: Pioneering Autonomous Inspections and Predictive Maintenance with ENSCO

In the rapidly evolving world of rail infrastructure management, a groundbreaking approach is revolutionizing safety and efficiency. ENSCO, a leader in inspection technologies and engineering solutions, is at the forefront of this transformation, lever…