Network Rail is advising passengers traveling between London Euston and Scotland over the Easter bank holiday to plan their journeys either side of the long weekend while essential upgrades take place on the West Coast Main Line. No trains will run between London Euston and Milton Keynes Central on Saturday 19 April, Sunday 20 April, […]
Category: Infrastructure
Greater Anglia customers reminded to check before travelling over Easter due to engineering works
There are planned essential engineering works and upgrades taking place on parts of the Greater Anglia rail network over the Easter period. While much of the rail network will be open this easter, passengers are reminded to check before they travel so they are aware of timetable changes linked to the bank holidays and engineering […]
Passengers reminded to check before travelling ahead of major Easter weekend rail upgrades
Passengers travelling between London Euston and Scotland are being advised to plan their journeys in advance over the Easter bank holiday weekend. Between Friday 18 April and Monday 21 April, Network Rail will be delivering a suite of upgrades to improve the reliability of the railway for passengers and freight services. The renewal of switches […]
Major engineering work across the south coast to impact services in Southampton, Portsmouth and Bournemouth during the Easter holidays
Rail passengers are being advised to plan their journeys in advance over Easter as Network Rail delivers an £86m investment programme consisting of more than 300 upgrade projects across the country. Across the Wessex route, train services along the south coast in Hampshire, notably between Southampton and Portsmouth, will be amended between 12 and 20 […]
Telent Secures First CP7 Telecoms-Only Framework to Enhance Rail Reliability in Western and Wales
As part of Network Rail’s five-year planning and funding cycle, Control Period 7 (CP7), Telent has been appointed to deliver a telecoms renewal programme throughout the Wales and Western Region, which spans London to Penzance, Bristol, the Cotswolds and the whole of Wales. This first telecoms-only framework to be awarded in CP7, will see Telent, […]
Passengers urged to plan ahead this Easter as essential engineering work takes place across south London, East Kent and East Sussex
Network Rail and train operators in the south east are urging passengers to plan ahead over the Easter period as a major programme of railway upgrades in south London, Kent and Sussex are delivered. While more than 90% of the railway will remain open over the Easter period, Network Rail’s engineers will complete a number […]
Groundbreaking thermal modelling slashes railway heating costs
Significant cost and carbon reductions will be delivered through an industry-leading initiative joint developed by Network Rail, AtkinsRéalis, Balfour Beatty and TSO, as the Central Rail Systems Alliance (CRSA). Planned track renewals will expand the number of “points heating systems” at many critical UK rail routes to prevent the build-up of snow and ice – […]
Early May Bank Holiday Weekend: Buses replace trains in the Basingstoke area while Network Rail carry out vital track improvements
Buses will replace trains in the Basingstoke area over the early May Bank Holiday Weekend (Sunday 4 and Monday 5 May) while Network Rail complete essential track improvements. Over the two-day closure, Network Rail’s engineers will be replacing the track that runs through Platform 4 at Basingstoke station as well as between Fleet and Farnborough […]