The FAA was adamant that Boeing would not produce more 737 MAX per month until it addressed the quality issues surrounding the 737 MAX program.
Category: United States
Vestas break US record with longest blade transport by rail
Vestas marked a couple of milestones in the United States by moving the first high-capacity factor V163-4.5 MW wind turbine blades manufactured at the Windsor Blades factory in Colorado by rail. Making the transport even more impressive is the size of the blades measuring 80.5 metres. As Vestas claims, these were the longest wind turbine […]