Made of energy-absorbing cellular cement blocks, EMAS beds are designed to slow aircraft that overshoot the end of a runway by crushing under their weight, bringing them to a controlled stop while causing as little damage as possible.
The project, which opened at the end of June, involved refurbishing the former international area after international services were shifted to the southern end of the terminal as part of a $260 million expansion in 2022.