WATCH: ‘Rexy’, One of Two TBMs for the Eglinton Crosstown West Extension, Breaks Through the Final Wall

TORONTO – One tunnel boring machine (TBM) excavating for the western underground segment of the Eglinton Crosstown West Extension has broken through the final wall.
The post WATCH: ‘Rexy’, One of Two TBMs for the Eglinton Crosstown West Extension, Brea…

IO and Metrolinx Award $255M Contract for Eglinton Crosstown West Extension Design & Build

ONTARIO – STRABAG Inc. was awarded the $255 million contract to for the second underground segment of the extension.
The post IO and Metrolinx Award $255M Contract for Eglinton Crosstown West Extension Design & Build appeared first on Railway Track…