Two Technical Reports From FRA: Concrete Railroad Ties; Visual and Automation-Aided Track Inspections

WASHINGTON, D.C. – The Federal Railroad Administration (FRA) has published two technical reports; one on the concrete railroad tie freeze-thaw durability and the other is supplemental to a previous study on track inspections.
The post Two Technical Rep…

MBTA Makes Progress on Red Line Trackwork; Removes 13 Speed Restrictions

BOSTON – The MBTA has made progress on its Red Line and subsequently removed 13 speed restrictions.
The post MBTA Makes Progress on Red Line Trackwork; Removes 13 Speed Restrictions appeared first on Railway Track and Structures.

Sound Transit Announces Six-Week Period of Link 1 Line Disruptions for Track Maintenance

SEATTLE – Starting May 12th, Sound Transit will have a six-week period of service disruptions to its Link 1 light rail service.
The post Sound Transit Announces Six-Week Period of Link 1 Line Disruptions for Track Maintenance appeared first on Railway …