LOS ANGELES – The LA Metro, along with the FTA, released a final EIS and EIR for the Southeast Gateway Line, formerly known as the West Santa Ana Branch Transit Corridor.
The post LA Metro Releases Final EIS/EIR for Southeast Gateway Line appeared first on Railway Track and Structures.