The main decision was to all agree the South Malvern side door pillar was in need of some TLC, Steve and Bob moved in and before long Steve had removed the lower Z section, and Bob had removed the heavily corroded floor bearer.Steve’s aim was to …
Uncategorised
Uncategorised