I’m hitting the cardboard now with the bridge all but done and most of the structures at least part built. So far I’m quite pleased with the feel of it. This doesn’t bode well as this is usually the juncture at which I start to doubt if I like it or not.
I am pressing on. I should be able to get this done in fairly short order and ready for WRG in March (this for a non-exhibitable layout). There is also a side project which is top secret for the Beccles show, not to mention further talks with the Devonians about something for RM next year. I make that three to get done.
I may as well start taking proper commissions at this rate.