C&L Engine Solutions, a subsidiary of C&L Aviation Group, announced that it would sell parts from a newly acquired Boeing 787-8 aircraft powered by two General Electric (GE) GEnx engines. This would be the third-ever Boeing 787 to be dismantled in the past year.
Please follow and like us: