Passengers warned disruption between Lancaster and Barrow-in-Furness could last two weeks after train derailment
Posted on by
Throughout the weekend, railway engineers have been inspecting the damage and carrying out ground investigations after a Northern train derailed in Grange-over-Sands, Cumbria on Friday 22 March.
Network Rail has released a time-lapse video of the work carried out to repair a landslip in Shropshire that caused the line to be closed for three weeks.
Passengers on the Southport line are being advised of a closure this August due to the replacement of a bridge that crosses the River Alt in Formby. Between the 19th and 23rd August, engineers will replace the 110-year-old bridge with a new concrete st…