Another good day with plenty achieved, starting off with the plywood van.
Steven was in to cut all the new plywood necessary, first up lots of measurements.
Then find a clear workbench in the woodwork shop to cut everything to size.
Now for lots of painting! Maurice got going with the primer.
Also in the woodwork shop, Robert and Dave were to be found making various bits of trim for the inside the RBr. Ben decided he also needed to be in on this!
New volunteer Marcus was also getting stuck into various bits and pieces inside.
While Dave managed to work around folk and carry on filling screw heads in the South vestibule.
We’ve suddenly realised that we really need to get on and fit the radiators to the RBr as it’s holding up further panelling progress, but first they need to be serviced, Ken and Stuart were on the case.
Today’s discovery was the adjustment; that long tube that goes the full length of the radiator. Adjustment is at one end but the valve is at the other.
Kevin got the job of cleaning up the long radiators.
Plenty was going on with the FK too, a door came off, not entirely sure why.
Simon was doing well with the internal battening for the North end.
Later on Robert was tapping in preparation for the door liner.
It was a very windy day but mostly pleasant, a gallery formed waiting for the next train…
And here it comes, P&O with a train well loaded.
Alan was here there and everywhere today, various welding bits on the RBr, FK, and when I finally got my camera out, shaping the new piece of plate for the bottom of the SO here.
Before it’s fitted what’s left needed a good clean up and de-rust, Dave did the honours and will get some paint on this on Tuesday.
Ben also found time to remove the door lock on the pillar at this end as it wasn’t quite seated right.
After Phil had replaced some of the plumbing on 5023 to try and sort the leak, Paul and Dennis filled the tank up again to check. I assume it was successful as the coach was taken out and replaced with the next in need of attention, SK 24949, by the end of the day.
The dirty gang had various bits and pieces to do, Andy gave the cleaned up vacuum cylinder a coat of primer by Andy.
And the buckeye couplers were fitted to the RBr.
One missing member today was Andy, explained when we spotted him second-manning the 37 on the last round trip of the day, us few remaining gave him a wave as he went past.
Related Posts
Sydneysiders to avoid huge transport disruptions over weekend
- gobstopper
- November 21, 2024
- 0
Metro Tunnel fires back at ‘bad planning’ accusations from opposition
- gobstopper
- November 21, 2024
- 0
Trains unable to use Metro Tunnel in labor’s latest stuff up
- Bardy Bigglesworth
- November 21, 2024
- 3
Swan Hill line and more information on Sunday 17/11/24
- Snuffle Nose
- November 21, 2024
- 7
Trains unable to use Melbourne Metro Tunnel
- Bardy Bigglesworth
- November 21, 2024
- 4
Rail spur required for major grain facility in Western Victoria
- Bardy Bigglesworth
- November 11, 2024
- 2
Trump wins second term as President, Kevin Rudd to pack his bags?
- Helen Carrie
- November 7, 2024
- 4
Potholes continue to cause problems in regional Victoria
- Bardy Bigglesworth
- November 1, 2024
- 2
The union buster and the unionist – an unlikely friendship
- Helen Carrie
- October 30, 2024
- 4
Australia’s fibre backbone race picks up speed
- Brian Evans
- October 28, 2024
- 0
The Management of V/line
- Snuffle Nose
- October 24, 2024
- 12
Speeding trucks imperil safety around Footscray
- Bardy Bigglesworth
- October 24, 2024
- 0
What the British really think of Lidia Thorpe and her antics
- Helen Carrie
- October 23, 2024
- 1
Warrnambool – V/Line to trash your long distance rail service
- Bardy Bigglesworth
- October 22, 2024
- 13
Barnaby Joyce is right about Anthony Albanese
- Helen Carrie
- October 20, 2024
- 1
Victorian Opposition considers reviving East West Link project
- Bardy Bigglesworth
- October 18, 2024
- 0
Julie Inman Grant should resign immediately over failed X litigation
- Helen Carrie
- October 18, 2024
- 1
Dan Andrews appointed chair of youth mental health service
- Helen Carrie
- October 18, 2024
- 2
Vlocity trains are not the answer for Regional Victoria
- Snuffle Nose
- October 14, 2024
- 12
Preserving cane train history before Australian rail buffs run out of puff
- gobstopper
- September 27, 2024
- 0
Metro Tunnel faces ANOTHER massive cost blowout
- Bardy Bigglesworth
- September 27, 2024
- 5
Onboard the R707 day tour to Maldon on 14th September 2024
- Snuffle Nose
- September 17, 2024
- 7
Melbourne has been named the most congested city in Australia
- Bardy Bigglesworth
- September 13, 2024
- 3
V/Line reduces seating capacity on Warrnambool line with Vlocity services
- Bardy Bigglesworth
- September 13, 2024
- 28
Full steam ahead for rail trail with no business case
- Bardy Bigglesworth
- September 9, 2024
- 7
Second western freight hub shelved in six months
- Bardy Bigglesworth
- September 6, 2024
- 4
Workers evacuated after fire in Metro Tunnel near Town Hall
- Bardy Bigglesworth
- September 5, 2024
- 0
The changing face of the former Spencer St Railway Station
- Snuffle Nose
- September 2, 2024
- 5
Bairnsdale line train services just became a whole lot worse
- Bardy Bigglesworth
- August 31, 2024
- 16
Riding the upgraded Warrnambool Line on 29th August 2024
- Snuffle Nose
- August 29, 2024
- 4
A trip to Waurn Ponds with new rail works at South Geelong
- Brian Evans
- August 28, 2024
- 8
Does Eureka Stadium in Ballarat need a railway station?
- Bardy Bigglesworth
- August 26, 2024
- 4
Reopening of the Warrnambool Line with DMU testing to commence
- Snuffle Nose
- August 13, 2024
- 11
Continuously welded rail on the Victorian Railway System
- Snuffle Nose
- July 13, 2024
- 2
The Darebin Council deception continues in Northcote
- Guest authors
- June 12, 2024
- 3
Exploring the rail freight opportunity in Australia
- gobstopper
- April 28, 2024
- 2