Second Bratislava to Austria line to be electrified

SLOVAKIA: Infrastructure manager ŽSR has started work on the long-planned electrification of the short 2·4 km single-track link from Devínska Nová Ves to the Austrian border at Marchegg.

Leave a Reply

Your email address will not be published. Required fields are marked *