On Saturday, November 25, volunteers Dwight Maxey, Kendall Crouch, Bruce Davis and Paul Brown braved frigid temperatures and a bit of snowfall to continue installing Christmas lights on our trainset. The group was able to get the lights on the C&W caboose and one string on Engine 104. They also installed interior lighting in the Rio Grande caboose. The volunteers worked a shorter than normal day due to the cold temperature, with most of the day only being in the 20’s. We are one step closer to being ready for the Christmas train rides coming in a couple of weeks!
There are only three photos of the work today due to the camera battery dying in the cold!
– Paul