![](https://infrastructuremagazine.com.au/wp-content/uploads/2024/05/RRR_GELU_WPD_major-occupation-announcement-3-672x378.jpg)
Stage 2 of the Warrnambool Line Upgrade is set to undergo a major works package over winter that will see the completion of the South Geelong to Waurn Ponds Duplication and level crossing upgrades.
From
Read More
Stage 2 of the Warrnambool Line Upgrade is set to undergo a major works package over winter that will see the completion of the South Geelong to Waurn Ponds Duplication and level crossing upgrades.
From
Read More