Boeing Advances On Fix For Anti-Icing Issue Delaying 737 MAX 7 & MAX 10 Certification

While Boeing has moved forward with designing the 737 MAXs engine anti-ice system, which would prevent the overheating of the engine nacelles that are built by the aircraft manufacturer, this could slip the entry-into-service date of the 737 MAX 7 and 737 MAX 10 to late 2025.

Leave a Reply

Your email address will not be published. Required fields are marked *