Major upgrades to the signalling between Rugby and Stafford have been completed and the line fully reopened for service yesterday, 23 January.
Related Posts
Avoiding bridge bashing, but not where it’s needed most
- Simon Walton
- September 25, 2024
- 0
Closed tunnel on Spain-France route poses problems for rail freight
- Marco Raimondi
- May 17, 2024
- 0
Rail traffic along the Madrid-Irún line, which connects the Spanish capital to France and is part of the TEN-T Atlantic Corridor, has been halted since 8 May due to a damaged tunnel. The line was supposed to reopen on Monday 20 May, but new information says this will not happen before Saturday 25 May. This…