The last day at Ethelton station, to be rebuilt as part of a $10 million upgrade.
These platforms were built in the 1960s from disused rail and are very much at the end of their lives with cracked and broken concrete.
![](https://www.vibewire.com.au/wp-content/uploads/2024/07/GRdahZoaUAAqrCs-683x1024.jpeg)
![](https://www.vibewire.com.au/wp-content/uploads/2024/07/GRdZYttb0AEhWuQ-1024x683.jpeg)
![](https://www.vibewire.com.au/wp-content/uploads/2024/07/GRdZTjJb0AMaknD-1024x683.jpeg)
![](https://www.vibewire.com.au/wp-content/uploads/2024/07/GRdZbm4bgAAlKs4-1024x683.jpeg)
The new platforms will provide level boarding
Source: https://x.com/AussieWirraway